Traffic Map

Traffic Stories

Incidents

There are no incidents reported at this time.

Construction

Charleston Blvd east of Rancho Dr

Work in the median in Las Vegas on Charleston Blvd east of Rancho Dr

Hwy 171 / Airport Connector SB at 215

On ramp closed-construction in Las Vegas on Hwy 171 / Airport Connector SB at 215

Hwy 171 / Airport Connector SB at 215

Construction- connector ramp closed in Las Vegas on Hwy 171 / Airport Connector SB at 215

I - 15 Both NB/SB between Russell Rd/Exit 36 and Sahara Ave/Exit 40

Construction work on I - 15 Both NB/SB between Russell Rd/Exit 36 and Sahara Ave/Exit 40

Rainbow Blvd / Hwy 595 Both NB/SB between Sunset Road and Russell Rd

Road construction- lane restrictions in Las Vegas on Rainbow Blvd / Hwy 595 Both NB/SB between Sunset Road and Russell Rd

S. Pecos Rd Both NB/SB between Sunset Rd and Hwy 592/Flamingo Rd

Road construction in Las Vegas on S. Pecos Rd Both NB/SB between Sunset Rd and Hwy 592/Flamingo Rd

Stephanie St Both NB/SB at Russell Rd

Road construction in Clark on Stephanie St Both NB/SB at Russell Rd

US 95 (I-515) NB between Eastern Ave/Exit 73 and I-15 / Exit 76a (Spaghetti Bowl)

Road construction, roadway reduced to two lanes in Clark on US 95 (I-515) NB between Eastern Ave/Exit 73 and I-15 / Exit 76a (Spaghetti Bowl)

215 Beltway WB at Warm Springs Rd --- Exit 9

Road construction, left lane closed in Las Vegas***Southern Beltway on 215 Beltway WB at Warm Springs Rd --- Exit 9

Chopper 13 Live Stream Video