Local News

Actions

TRAFFIC TROUBLES: More Project Neon closures around Spaghetti Bowl

Posted at 7:36 PM, Sep 05, 2016
and last updated 2016-09-05 22:36:53-04

The Nevada Department of Transportation will be doing Project Neon related construction work from Tuesday, September 6, through Sunday, September 11, in downtown Las Vegas. There will be lane and ramp restrictions and detours, as needed.
 
Tuesday, September 6 – Wednesday, September 7
· The right ramp lane from Interstate 15 northbound to U.S. Highway 95 northbound will be closed from 9 p.m., September 6, until 6 a.m., September 7.
· There will be lane restrictions on eastbound Oakey Boulevard between Kiltie Way and Martin Luther King Boulevard from 9 p.m., September 6, until 6 a.m., September 7.
 
Tuesday, September 6 – Thursday, September 8
· There will be lane restrictions on Alta Drive between Martin Luther King Boulevard and Interstate 15 nightly from 9 p.m. until 6 a.m., September 6 through September 8.
· There will be lane restrictions on northbound Martin Luther King Boulevard at Alta Drive nightly from 9 p.m. until 6 a.m., September 6 through September 8.
 
Tuesday, September 6 – Friday, September 9
· There will be lane restrictions on Interstate 15 northbound exit to Charleston Boulevard westbound from 9 p.m. until 6 a.m., September 6 through September 9.
 
Tuesday, September 6 – Thursday, September 15
· The U.S. Highway 95 southbound off-ramp to Rancho Drive will be closed nightly from 9 p.m. until 6 a.m., September 6 through September 15.
· The sidewalk on the west side of Rancho Drive between Mesquite Avenue and Bonanza Road will be closed nightly from 9 p.m. until 6 a.m., September 6 through September 15.
 
Tuesday, September 6 – Saturday, October 1
· There will be lane restrictions on eastbound Charleston Boulevard between Interstate 15 and Grand Central Parkway nightly from 9 p.m. until 6 a.m., September 6 through October 1.
· There will be lane restrictions on westbound Charleston Boulevard between Grand Central Parkway and Martin Luther King Boulevard nightly from 9 p.m. until 6 a.m., September 6 through October 1.
 
Tuesday, September 6 – Tuesday, November 15
· The Martin Luther King Boulevard onramp to U.S. Highway 95 northbound will be closed from September 6 until November 15.
 
Tuesday, September 6 – Tuesday, November 15
· There will be intermittent right lane closures along southbound Martin Luther King Boulevard near the U.S. Highway 95 overpass from September 6 through November 15.
· There will be intermittent sidewalk closures along the west side of Martin Luther King Boulevard between Bonanza Road and Mesquite Avenue from September 6 through November 15.
· There will be lane restrictions on north and southbound Grand Central Parkway between Bonneville Avenue and Charleston Boulevard nightly from 9 p.m. until 6 a.m., September 6 through November 15.
 
Thursday, September 8 – Friday, September 9
· There will be lane restrictions on westbound Bonneville Avenue between Grand Central Parkway and Martin Luther King Boulevard from 9 p.m., September 8, until 6 a.m., September 9.
 
Thursday, September 8 – Saturday, September 10
· There will be daytime lane restrictions along Desert Lane between Pinto Lane and Alta Drive from September 8 through September 10. Street parking along northbound Desert Lane will be restricted during this time frame.
 
Saturday, September 10 – Sunday, September 11
· The northbound Interstate 15 exit to Charleston Boulevard westbound will be closed from 9 p.m., September 10, until 6 a.m., September 11.
 
Saturday, September 10 – 2018
· The Interstate 15 northbound exit to westbound Charleston Boulevard will move to a temporary configuration, west of its current location starting September 10 and lasting through 2018. A reduced speed limit will be in effect.
 
Saturday, September 10 – Tuesday, November 15
· Northbound Grand Central Parkway will be closed from Charleston Boulevard to Las Vegas Premium Outlet Drive nightly from 9 p.m. until 6 a.m., September 10 through November 15.
 
Sunday, September 11 – Tuesday, November 15
· Southbound Grand Central Parkway lanes between Charleston Boulevard and Iron Horse Court will be shifted east from September 11 until November 15.
 
Motorists should use caution while travelling through the work zone, heed construction signage, and take alternate routes, if possible.