The Nevada Department of Transportation will reduce northbound U.S. 95 between Craig Road and the 215 Beltway to one lane of traffic from 9 p.m., March 16, until 5 a.m., March 17, in northwest Las Vegas.
Southbound U.S. 95 between Durango Drive and the 215 Beltway will also be reduced to a single lane of traffic during the same time.
The temporary lane restrictions are required for construction of a 60-foot-tall, 2,500-foot-long flyover linking the westbound 215 Beltway to southbound U.S. 95 as part of the $47 million “Centennial Bowl” interchange, scheduled to finish this summer. Las Vegas Paving is the general contractor.